| |
GROUT
PUMPS RECIPROCATING TYPE. CEMENT GROUT PUMPS.
CAPACITIES 1Kg / SQCM TO 20Kg / SQCM. DELIVERY 1
BAG / HR TO 200 BAG / HR. |
| |
| |
USED
AT IPS-BANDRA TUNNEL & GHATKOPAR HIGH
LEVEL TUNNEL.
HIGH DELIVERY RATE & LOW WORKING AREA.
DELIVERS 20 TO 50 BAGS /HR
AT 10KG/SQCM |
Cement
grout pump. |
|
| |
|
| |
EPOXY
/ P.U . TWO / THREE COMPONENT GROUT PUMP.
AUTOMATIC DOZING. DELIVERS UP TO 2 LTRS
/ MIN.
PRESSURE
0 - 20 Kg/ SQCM.
MACHINE SPECIALY DEVELOPED FOR LOW WORKING
SPACE AREAS.
USED
AT DHARAVI TUNNEL FOR DYWIDAG-AG & BMC.
|
|
| |
SCOPE
OF MATERIAL SUPPLY AND EXECUTION |
| |
| Sr.
No. |
Description |
Supplied
/ Executed by |
1 |
Expansion
joint filler board |
Supply
by Elcon products |
2 |
Compressible
Debonding strips |
Supply
by Elcon products |
3 |
Temporary
seal of 8 mm rod |
Supply
by Elcon products |
4 |
Green
concrete-saw grove 4mm X 110 mm |
Execution
by Eff-tech |
5 |
Widening
of grove to 8 / 10 mm |
Execution
by Eff-tech |
6 |
Sealant
application (silicon,P.U.,Polysulphide,etc) |
Execution
by Eff-tech |
| 7 |
Sealant
(silicon,P.U.,Polysulphide,etc) |
Supply
by Elcon products |
8 |
Pre formed
seal (Neoprene seal) |
Execution
by Eff-tech |
9 |
Pre formed
seal (Neoprene seal) |
Supply
by Elcon products |
|
| |
Schedule
of grove cutting:
1. Initial cutting is carried out at green-concrete
stage.
2. Final cut is done after 21 to 28 days.
3. Sealant is done on bone dry surface, generally
after 1 or 2 days, i.e. between 30th and 35th day.
|
| |
We
help you in selecting & negotiating sealant
manufacturers, also we optimize sealant consumption
to suit & qualify various tests at site. We
conduct field test on trial patch to technically
ratify the sealant suitability.
We
also undertake complete contract with sealant. |
| |
|
|
In
pursuit of continuous improvement, the technical
contents are subject to change without any notice. |